Build Notes 1.2.5927

We’ve been hard at work! Take a look at what we’ve been up to: Additions: Added an optional address field on the import lead form. Remodeled: Both margin and markup will display at the bottom of an estimate. When adding a new line item template (labor, material or...

Build Notes 1.2.5854

We’ve been hard at work! Take a look at what we’ve been up to: Added: Added a new hyperlink tool in the rich text editor that allows you to create a “clickable” link. Remodeled: Increased size of description boxes for line items on tablet devices. Repaired: Removing...

Build Notes 1.2.5526

We’ve been hard at work! Take a look at what we’ve been up to: Remodeled: When adding a new project lead to an existing customer, the button to add that project lead has been moved to the top of the editor. Repaired: User permissions for managing time logs will no...