Here’s what’s new:

  • Added an option in the estimate to hide options for accepting, requesting revision, and rejecting the estimate from the portal.
  • Added a button on the estimate card to easily mark an estimate as paid. There is an option inside of the invoice editor as well to mark the invoice as paid.
  • Time log report added to the reports page.
  • When clicking on hyperlinks in Projul, another tab will open instead of the current tab.
  • The permission to edit templates will control who can apply templates to project leads as well.
  • Photos and files from the gallery can be attached to tasks through the task editor.
  • Fixed an issue on Android where the “x” to close out of an editor wasn’t displaying on some devices.
  • Fixed an issue with long project types on leads.