• Added the ability to attach photos & files to your estimates. Your customers can see and download them from the estimate eSignature link.
  • Introduced more in-depth tooltips to the main menu to provide context about the purpose of each page.
  • Separated the Estimates page into its own section instead of being part of the Sales Pipeline to provide easier access to your estimates.
  • Minor Sales Pipeline bug fixes.