Select Page

Cant

An angled surface or edge in construction, often used to direct water runoff or for aesthetic design.

Cantilever

A projecting beam or structure supported only at one end, used in overhanging designs like balconies.

Catastrophic Failure

A sudden and complete failure of a structural component, leading to potential collapse or significant damage.

Caulking

The application of a sealing material to joints or seams to prevent water or air infiltration in buildings. Get real-time pricing for materials and labor with Projul.