Select Page

As-builts

Revised drawings or documents that reflect all changes made during construction, representing the project as it was actually built.

Back Charge

An amount of money charged against a subcontractor for work the general contractor had to perform due to the subcontractor’s failure to meet contractual obligations.

Backer Rod

A flexible foam rod inserted into joints or cracks before applying sealant or caulk. Backer rods help control the depth of the sealant, ensure proper adhesion, and provide a backing to create a smooth, finished surface. Get real-time pricing for materials and labor...

Backfilling

The process of refilling excavated areas with soil or other materials after construction work like foundation or utility installation.