Select Page

Barrier Membrane

A layer of material installed to prevent the passage of water, vapor, or gases through walls, floors, or roofs. Barrier membranes are essential for protecting building interiors from moisture damage and improving energy efficiency. Get real-time pricing for materials...

Beam

A horizontal structural element that supports loads perpendicular to its length, commonly used in floors and ceilings. Get real-time pricing for materials and labor with Projul.

Bearing Capacity

The maximum load that soil or a foundation can support without risk of failure or excessive settlement.

Best Value Method

A procurement approach that evaluates contractors based on price and qualitative factors to determine the most advantageous offer.

Bid

A formal offer submitted by a contractor or construction firm to a client, proposing to perform specified work at a stated price. Bids are often competitive and form the basis for awarding construction contracts. Create bids faster with Projul.