Select Page

Section Drawing

An architectural drawing that shows a vertical cut-through of a building, revealing internal features.

Sensor

A device that detects and responds to changes in physical conditions, used in building systems for monitoring. Get real time pricing for labor and materials with Projul

Shiplap

Wooden boards with overlapping joints used in siding or interior paneling to create a tight seal. Get real time pricing for labor and materials with Projul

Shop Drawings

Detailed drawings produced by contractors or suppliers illustrating how specific components will be manufactured and installed.

Shoring

Temporary supports used during construction to stabilize structures or trenches.