Skip to main content

X-Bracing

X-Bracing

X-Bracing is a structural reinforcement method involving diagonal supports that cross in the shape of an ‘X’ within a frame or structural panel.

X-bracing is used to increase the rigidity and stability of buildings and bridges, helping structures resist lateral loads such as wind and seismic forces.

Projul was built by a former general contractor who dealt with x-bracing on real job sites. Over 5,000 contractors use Projul to run their businesses more efficiently.