Pool Contractor Software. Make a splash with clients by delivering outstanding service, throughout the project. Built by construction pros with honest pricing.

Coordinate multi-phase pool builds from permit to final fill without anything falling through the cracks. Projul tracks every phase, schedules crews and subs, handles progress billing, and gives homeowners a portal so they stop calling every Monday. Flat-rate pricing with no per-user fees means your whole team gets full access.

  • Grow your business with our advanced lead pipeline features
  • Impress your clients with our customer portal
  • Send reliable and accurate estimates using the assemblies calculator
Schedule a Demo
Pool Contractors management software screenshot in Projul

What Is Pool Contractor Software?

Pool contractor software is a project management platform designed for the multi-phase, multi-month nature of pool construction, covering everything from permit applications and excavation scheduling to equipment installation and final inspection sign-off.

Projul’s pool contractor software helps pool builders manage multi-phase construction from excavation through final inspection with scheduling and budgeting tools built by contractors who understand long-timeline projects. Projul offers flat-rate pricing with no per-user fees for construction companies of all sizes.

Building a swimming pool is one of the longest and most complex residential construction projects a homeowner will ever experience. From the first shovel in the ground to the day they cannonball into clear water, the typical pool project runs 8 to 16 weeks. During that time, you are coordinating excavation crews, plumbers, electricians, steel and rebar installers, gunite or shotcrete crews, tile and coping specialists, deck and hardscape contractors, equipment installers, and inspectors. All while a homeowner watches from the back porch and asks when they can swim.

Without pool contractor software, those 8 to 16 weeks are managed through phone calls, text messages, and the project manager’s memory. That works until it does not. And in pool construction, when something slips, the cascading delays can add weeks to a timeline and thousands to your costs.

Projul helps pool contractors manage every phase of the build from one platform. Over 5,000 contractors use Projul to run their operations, and pool contractors specifically benefit from the multi-phase scheduling, long-timeline project management, and customer communication tools that keep complex builds on track.

Why Pool Construction Needs Specialized Software

Pool builds are not like other construction projects. A typical home remodel might run three to six weeks. A pool project doubles that. And the sequence of work is rigid in ways that other projects are not.

You cannot pour gunite before plumbing and electrical rough-in passes inspection. You cannot set tile before the shell cures. You cannot install equipment before plumbing is connected. You cannot fill the pool before the plaster crew finishes. Every phase depends on the one before it, and many phases depend on weather, inspector availability, and material deliveries that are outside your control.

Generic project management tools do not understand these dependencies. A tool designed for software development sprints or marketing campaigns cannot handle the reality of a gunite pour getting rained out and pushing your tile crew back by a week, which pushes your equipment installation back by a week, which pushes your plaster date into a period when overnight temps drop below 50 degrees and now you have a real problem.

Pool contractor software like Projul is built for exactly this kind of multi-phase, dependency-heavy scheduling. And that difference is what separates a pool contractor who finishes on time from one who is constantly putting out fires.

Manage Every Pool Project From First Inquiry to Final Fill

Capture Pool Leads During Seasonal Peaks

Pool construction is seasonal in most markets. You get a flood of inquiries in late winter and spring from homeowners who want to swim by summer. If you do not have a system to capture and track those leads, you lose work to the competitor who followed up faster.

Projul’s lead pipeline tracks every pool inquiry with its source, whether it came from your website, a home show booth, a referral, or a yard sign at a job site. Set follow-up reminders so no prospect goes cold while you are knee-deep in active builds. Track which leads convert and which marketing channels actually produce signed contracts.

Swimming pool construction software with a built-in CRM means you are not juggling a separate lead tracking tool. Everything from first inquiry to final payment lives in one platform.

Build Detailed Pool Estimates

Pool estimates are complex because every project is different. Pool size, depth, shape, finish material, equipment package, decking, water features, lighting, fencing, and landscaping all affect the price. A standard rectangular pool with basic plaster and a single pump is a very different bid from a freeform pool with pebble finish, variable speed pump, heater, saltwater system, waterfall, LED lighting, and a raised spa.

Projul’s estimating tools let you build itemized bids with every component priced out. Save templates for your most common pool configurations so you are not building every estimate from scratch. When the homeowner wants to add a spa or upgrade to pebble finish, you add the line items and the estimate updates instantly.

When the client signs, that estimate converts directly into a scheduled project. Your line items become your job cost budget. No re-entering data. No spreadsheet formulas to break. The work flows forward. If you want a head start, check out our free pool and spa estimate templates with line items already built for common pool configurations.

Map the Full Pool Build Schedule

A typical new pool build follows this general sequence:

  1. Design and permits. Finalize the pool design, submit plans, and wait for permit approval. This can take two to six weeks depending on your jurisdiction.
  2. Layout and excavation. Mark the pool location and dig the hole. Weather dependent. Saturated ground means you wait.
  3. Steel and rebar. Install the reinforcing steel framework. Requires inspection before the next phase.
  4. Plumbing rough-in. Run all the pool plumbing lines. Must pass inspection.
  5. Electrical rough-in. Run conduit and wiring for pumps, lights, and controls. Must pass inspection.
  6. Gunite or shotcrete. Spray the concrete shell. Weather dependent. Cannot pour in rain or extreme cold.
  7. Curing period. The shell needs time to cure properly. Typically 7 to 10 days.
  8. Tile and coping. Install waterline tile and coping stones around the pool edge.
  9. Decking and hardscape. Pour or install the pool deck. Coordinate with the landscape contractor.
  10. Equipment installation. Set the pump, filter, heater, saltwater system, and any automation equipment.
  11. Plaster or finish. Apply the interior finish. Weather sensitive. Must be done in the right temperature range.
  12. Fill and startup. Fill the pool, balance chemicals, run equipment, and walk the homeowner through operation.

Pool contractor software like Projul lets you map every one of these phases with dependencies, so you know at a glance which phases are complete, which are in progress, and which are coming up. When a phase slips, the downstream schedule adjusts. Your office and your field team see the same timeline.

This kind of scheduling visibility is what pool building software exists for. Without it, you are tracking a 12-phase, 16-week project in your head, and something is going to fall through.

Handle Weather Delays Without Chaos

Weather is the biggest variable in pool construction. Excavation cannot happen in saturated soil. Gunite and shotcrete cannot be applied in rain. Plaster cannot be applied when temperatures drop below 50 degrees overnight because it will not cure correctly.

When weather kills a day or a week, every downstream phase shifts. Projul’s scheduling tools let you push the affected phase on the calendar and immediately see how it impacts every trade that follows. Your tile crew, decking contractor, equipment installer, and plaster crew all get updated schedules on the mobile app. No round of phone calls. No scrambling.

Swimming pool construction software that handles weather delays well is the difference between a controlled schedule adjustment and a week of chaos with angry subs and a confused homeowner.

Pool construction is one of the most heavily inspected residential projects. You will typically need inspections for steel, plumbing, electrical, pre-gunite, barrier fencing, and final sign-off. Miss an inspection or fail one, and your entire schedule sits idle until the reinspection.

Projul lets you build inspection milestones into your project schedule. Track which inspections are complete, which are pending, and which are the current bottleneck. When your steel inspection is scheduled for Thursday and you need a passing result before gunite can be scheduled for the following week, that dependency is visible on the project timeline.

Pool contractor software that tracks permit and inspection status keeps you from scheduling a trade before the inspection that gates it has passed. That one feature can save you thousands in wasted labor and days of lost schedule.

Track Equipment Lead Times

Pool equipment has gotten harder to source in recent years. Variable speed pumps, saltwater chlorinators, heaters, automation systems, and LED lighting all have lead times that can range from a few days to several weeks depending on the brand, model, and current supply chain conditions.

Projul lets you track equipment orders with expected delivery dates and tie those dates to your project schedule. If a heater is backordered and will not arrive until week 10, you know that before you schedule the equipment installation for week 8. That kind of forward planning prevents the frustrating scenario where your equipment installer shows up and the equipment is not there. On the Pro plan, Projul AI Connect lets you tell ChatGPT, Claude, or another AI assistant that the heater slipped two weeks, and it moves the equipment install and the tasks that follow it on your Projul schedule.

Job Costing for Long Pool Projects

Pool projects run long enough that small cost overruns compound into big ones if you are not tracking them. A little extra excavation cost here, an extra day of labor there, an equipment price increase that you did not pass through to the homeowner. By the end of a 12-week project, those small misses can cut your margin in half.

Projul tracks estimated versus actual costs on every phase of the pool build in real time. You see your labor, materials, subcontractor costs, and equipment spend compared to your original estimate at any point during the project. When excavation runs over because you hit rock, you know it immediately and can make decisions about how to handle the extra cost.

Contractors using Projul report a 32% average profit increase. For pool contractors running projects that span months, real-time job costing is the single most important feature for protecting profit.

New Build vs. Renovation Cost Tracking

Pool renovation projects have different cost structures than new builds. A replaster and retile project is primarily labor and materials with a shorter timeline. An equipment upgrade project is primarily equipment cost with minimal labor. A full renovation with new tile, coping, decking, and equipment is closer to a new build in complexity.

Pool building software like Projul lets you set up different project templates with appropriate cost categories for each type of work. Your job costing reports compare apples to apples when you are reviewing profitability across your project portfolio.

Time Tracking for Pool Construction Crews

Pool projects involve your own crews and multiple subcontractors, often working on different days or overlapping on the same day. Tracking who worked when and on which project is critical for accurate job costing and payroll.

Projul’s time tracking with GPS verification confirms your crew is at the right job site when they clock in. The hours feed directly into job costing by project and by phase. When you are running five pool builds at different stages, you know exactly where every labor dollar went.

Keep Homeowners Calm During a Multi-Month Build

Pool construction tests homeowner patience like nothing else. Their backyard is a construction zone for two to four months. There is heavy equipment, noise, crews coming and going, and a giant hole in the ground that slowly transforms into a pool. They want updates. They want to know when they can swim.

Projul’s customer portal gives pool clients a window into the entire build process. They can see which phase is current, which is next, and when the project is expected to finish. When the schedule shifts because of weather, they see the updated timeline without you having to make a phone call.

This kind of transparency is a competitive advantage for pool contractors. The builder who gives homeowners a portal where they can check progress any time stands out from the one who goes quiet for two weeks and then shows up asking for a draw payment.

Rated 4.9/5 on G2 for ease of use, Projul’s customer portal is simple enough for any homeowner and detailed enough to answer their questions before they pick up the phone.

Invoicing for Long Pool Projects

Pool projects need progress billing. You are not going to finance a $60,000 to $100,000 project and invoice at the end. Standard pool billing typically follows a schedule tied to project milestones: deposit at contract signing, a draw after excavation, a draw after shell completion, a draw after tile and coping, and a final payment at completion and startup.

Projul makes progress billing straightforward. Set up your invoice milestones, tie them to project phases, and send each invoice when the milestone is reached. Change orders get added to the appropriate draw. Homeowners can pay online through the customer portal. Your QuickBooks syncs automatically.

Faster payments mean better cash flow, and cash flow is everything when you are carrying costs on multiple pool builds at the same time.

Warranty and Maintenance Plan Tracking

Many pool contractors offer warranty coverage and optional maintenance plans after the build. A one-year warranty on equipment and workmanship is standard. Some contractors also offer ongoing maintenance contracts for weekly pool service.

Projul’s project records keep warranty terms and expiration dates accessible. When a homeowner calls about a pump issue eight months after completion, you can pull up the project, check the warranty status, and schedule the service call without digging through filing cabinets.

This ongoing relationship also creates future revenue opportunities. A pool that is five to seven years old will need replastering, new tile, and possibly equipment upgrades. Having that original project data in your pool contractor software means you can reach out proactively when the time is right.

Pool Construction Guides for Your Team

Building a pool involves coordinating excavation, plumbing, electrical, decking, and finish work across weeks of construction. Our pool building guide covers the full construction sequence from dig to fill, including soil conditions, rebar placement, and shotcrete application.

If your company also handles spas, hot tubs, or combination builds, our pool and spa construction guide walks through the additional plumbing, heating, and jet system considerations that differentiate spa work from standard pool installs.

Why Pool Contractors Switch to Projul

Pool contractors typically come to Projul after trying to manage multi-month builds with tools that were not designed for that timeline. The breaking point is usually a weather delay that cascaded into three weeks of rescheduling, a missed inspection that nobody tracked, or a draw invoice that was two weeks late because the office did not know the milestone was reached.

Here is what makes Projul different for pool contractors:

  • Built by a contractor. Every feature exists because a real contractor needed it, not because a product manager thought it sounded good.
  • Flat-rate pricing. Plans start at $2,388 per year, and Core is $4,788 per year for up to 10 users. Your estimators, PMs, crew leads, office staff, and subs all get full access. No per-user fees.
  • Multi-phase scheduling. Drag-and-drop scheduling with task dependencies built for the 12-phase, 16-week reality of pool construction.
  • Customer portal. Keep homeowners informed and reduce phone calls during long builds.
  • Rated 4.9/5 on G2. For ease of use and quality of support. Your crew uses it by lunch on day one.
  • Over 5,000 contractors. The platform scales from a three-person pool company to a regional builder running 30 concurrent projects.

Honest Pricing for Pool Contractors

Most pool contractor software charges per user. When your team includes estimators, project managers, office staff, crew leads, and the multiple subcontractors you want to give schedule access to, per-user pricing gets expensive fast.

Projul starts at $2,388 per year for your pool company, no per-user fees. Your estimators, crew leads, and office staff all get full access without inflating the bill. Over 5,000 contractors use Projul to manage their operations, and pool contractors consistently report saving 2+ hours daily on admin work. G2 users rate Projul 4.9/5 for ease of use and 4.9/5 for quality of support.

Permit and Inspection Scheduling for Pool Builds

Pool construction is one of the most permit-heavy residential projects you will ever manage. Depending on your jurisdiction, a single pool build can require six or more separate inspections: steel and rebar, plumbing rough-in, electrical rough-in, pre-gunite, barrier fencing, and final sign-off. Each inspection has its own scheduling window, its own inspector preferences, and its own potential to stall your entire project if something goes wrong.

The problem most pool contractors run into is not that they forget about inspections entirely. It is that they lose track of which inspection is next, who scheduled it, and whether the prerequisite work is actually done. Your plumber finishes rough-in on Tuesday. Your office calls for the plumbing inspection on Wednesday. The inspector cannot come until the following Monday. Now your gunite crew, which was scheduled for Tuesday, has to push back a week. That one gap cascades through your tile crew, your equipment installer, and your plaster date.

Pool contractor software like Projul lets you build every permit milestone and inspection checkpoint directly into your project schedule. Each inspection becomes a task with a dependency on the work that must pass before it. When your steel inspection is pending, the system shows that gunite cannot start until that inspection clears. Your office staff can track which inspections have been called in, which are confirmed, and which are still waiting.

This matters even more when you are running multiple pool builds at the same time. If you have four active projects, you might have 20 or more inspections in various stages across those jobs. Tracking that on a whiteboard or in your head is a recipe for missed calls, wasted crew days, and angry homeowners wondering why nothing happened this week.

Projul’s scheduling tools give you a single view of every inspection across every active project. You see which jobs are waiting on inspectors and which are cleared to proceed. When an inspection fails and needs a reinspection, you update the schedule and every downstream trade adjusts automatically. Your crews get notified on the mobile app without a round of phone calls.

For a deeper look at how permit tracking works in construction, check out our construction permit guide or our review of the best construction permit tracking software available today.

For contractors working across multiple municipalities, inspection requirements and scheduling processes vary by jurisdiction. One city might let you call in inspections the day before. Another requires 48-hour notice. Some inspectors will only come in the morning. Others have a two-week backlog during peak season. Keeping all of that straight across four or five active builds in different cities is a full-time job on its own. Projul lets you add jurisdiction-specific notes to each project so your office staff knows exactly which process to follow for each build.

The bottom line is this: in pool construction, inspections are the gates that control your entire timeline. If you are not tracking them in your software, you are leaving your schedule to chance.

Equipment Procurement Tracking for Pool Projects

Pool equipment procurement has become one of the biggest headaches in the industry over the past few years. Variable speed pumps, saltwater chlorine generators, pool heaters, automation controllers, and LED lighting systems all have lead times that shift constantly. A pump that was in stock last month might be backordered for six weeks today. A heater you spec on every build might get discontinued mid-season with no direct replacement.

The real cost of poor procurement tracking is not just the price of the equipment. It is the schedule impact. When your equipment installer shows up on week 10 and the variable speed pump is sitting in a warehouse two states away, you just lost a week. Your plaster crew, who was lined up for week 11, now has to reschedule. The homeowner, who was told they would be swimming by Memorial Day, is not swimming by Memorial Day.

Projul lets you track every equipment order inside the project record. Log the vendor, the order date, the expected delivery date, and the actual arrival. Tie delivery dates to your project schedule so you can see at a glance whether equipment will arrive before the installation phase begins. If a delivery date slips, your project timeline reflects that change immediately.

This kind of visibility is especially important when you are running multiple pool builds that share the same equipment suppliers. If your heater vendor tells you lead times just jumped from two weeks to six weeks, you need to know which of your active projects are affected and adjust procurement timing on all of them. Projul’s project management tools let you see that across your entire portfolio.

Smart procurement also means ordering early enough to avoid delays but not so early that you are storing expensive equipment on a job site for weeks where it can get damaged or stolen. For each pool build, build a procurement checklist with order-by dates calculated backward from your installation phase. Our construction procurement management guide walks through this process in detail.

Beyond the big-ticket items, do not overlook the smaller components that can still stall a project. Waterline tile, coping stones, specific deck pavers, and pool finish materials all have their own lead times and availability windows. A tile that gets discontinued mid-project means a design change, a homeowner decision, and a reorder that adds weeks. Track every material order, not just the equipment, and build buffer time into your procurement schedule for the items you cannot control.

The contractors who stay on schedule are the ones who treat equipment procurement as a critical path item, not an afterthought. Your pool contractor software should make that tracking automatic, not something you have to remember.

Warranty and Maintenance Contract Management

The pool build does not end when the homeowner jumps in. Most pool contractors offer a one-year warranty on workmanship and pass through manufacturer warranties on equipment. Some contractors also sell ongoing maintenance contracts for weekly chemical balancing, filter cleaning, and equipment checks. These post-build relationships are a significant source of recurring revenue, but only if you track them.

The most common warranty failure is not a defective product. It is a lost record. A homeowner calls 10 months after completion saying the pump is making a strange noise. Is it under warranty? Which pump model did you install? Who was the manufacturer? When was it installed? If you have to dig through filing cabinets, email threads, and old invoices to answer those questions, you are wasting time and looking unprofessional.

Projul keeps every project record accessible long after the build is complete. The equipment list, installation dates, warranty terms, and manufacturer information all live in the project file. When that warranty call comes in, you pull up the project, confirm coverage, and schedule the service visit in minutes. Your client portal can even give homeowners access to their project details so they can check warranty information themselves before calling you.

Maintenance contracts are where the real recurring revenue lives. A pool that gets professional weekly service runs better, lasts longer, and creates a relationship that leads to future renovation work. When that pool is seven years old and the plaster is showing its age, you are the contractor who gets the replaster call because you have been there every week.

Track maintenance contracts in your pool contractor software with service schedules, renewal dates, and billing cycles. When a contract is coming up for renewal, reach out before it lapses. When seasonal service changes are needed, your schedule reflects the shift. Projul’s automated client reminders can notify homeowners about upcoming service visits and contract renewals without your office staff making individual calls.

Warranty tracking also helps with your reputation. When a homeowner posts a review saying “they took care of a pump issue at nine months, no questions asked,” that review sells your next three pool builds. When a warranty claim turns into a finger-pointing match because nobody can find the installation records, that becomes the bad review that costs you work. Keep clean records. Respond fast. Make warranty service feel easy for the homeowner, even when it is a headache on your end.

The pool contractors who build a service and maintenance arm alongside their construction business create a revenue floor that carries them through the slow months. Your software should support that business model, not just the build phase.

Seasonal Opening and Closing Service Scheduling

Pool construction is seasonal, but so is pool service. In most markets, pool owners need a professional opening in spring and a closing in fall. These seasonal service windows create a predictable, high-volume workload that can keep your crews busy during the shoulder seasons when new construction slows down.

The scheduling challenge is that openings and closings happen in compressed time windows. In northern markets, every pool owner wants their pool open by Memorial Day and closed by mid-October. That means you are trying to schedule 50, 100, or 200 service visits into a four-to-six-week window. Without software, that scheduling puzzle eats up days of office time and still results in double-bookings, missed appointments, and unhappy customers.

Projul’s scheduling tools let you plan seasonal service routes alongside your active construction projects. Create recurring service tasks for your maintenance contract customers. Schedule opening and closing visits in batches by geography so your crews are not driving back and forth across town. When a homeowner needs to reschedule, drag the visit to a new date and the crew sees the change on their phone.

The financial impact of seasonal service is significant. A typical pool opening runs $200 to $400. A closing runs $250 to $500. If you are managing 100 maintenance accounts, that is $45,000 to $90,000 in seasonal revenue before you pour a single yard of concrete. For many pool contractors, seasonal service is what keeps the lights on between November and March.

Seasonal service also feeds your construction pipeline. Every opening and closing visit is a chance to inspect the pool condition and recommend work. A cracked tile here, a worn plaster surface there, a pump that is getting noisy. These observations turn into renovation proposals, equipment upgrades, and new pool referrals from satisfied customers.

Track seasonal service history in Projul so you know which pools have recurring issues, which equipment is aging out, and which customers are candidates for renovation proposals. Your lead pipeline can capture these upgrade opportunities right from the service visit notes.

Building a seasonal service operation alongside your pool construction business gives you year-round revenue and a built-in source of renovation leads. The contractors who figure this out stop worrying about the off-season and start planning for it. Our construction seasonal slowdown guide covers more strategies for keeping your business productive when new builds dry up.

Stop Managing Pool Builds From a Text Thread

If you are still coordinating excavation crews, sub schedules, inspections, and homeowner updates through phone calls and text messages, you already know it is not working. Details slip. Schedules conflict. Homeowners get frustrated. And you spend your evenings catching up on admin instead of running your business.

Pool contractor software like Projul puts your entire operation in one place. From the first lead through the final fill, every phase, every cost, and every client communication is tracked and visible. Your office knows what is happening in the field. Your field knows what is happening on the schedule. And your homeowners know when they can swim.

Over 5,000 contractors have already made the switch. Your competition is probably one of them.

Frequently Asked Questions

What does efficient management mean for Pool Contractors?
Efficient management for pool contractors means coordinating a multi-month build with dozens of moving parts without anything falling through the cracks. You need to track permit approvals, schedule excavation around weather windows, sequence plumbing and electrical rough-in before the shell goes in, time your gunite or shotcrete pour, coordinate tile and coping crews, schedule equipment installation, and manage final inspections. Projul puts all of these phases on one timeline with dependencies, so when one phase shifts, you see exactly how it affects everything downstream. That is what efficient management looks like for a pool contractor.
Why should Pool Contractors use management software?
Pool projects run 8 to 16 weeks and involve more sequential trades than almost any other residential project. Without pool contractor software, you are managing all of that through phone calls, text threads, and memory. One missed inspection holds up the entire project. One late equipment order pushes your plaster date. One weather delay on excavation shifts everything behind it. [Pool contractor software](/blog/best-pool-contractor-software/) like Projul makes the full project timeline visible to your office and your field team, tracks every phase, and gives homeowners a portal so they stop calling every Monday asking what happens next.
Which features to look for in the best pool contractor software?
Look for these features in pool contractor software: a lead pipeline that tracks seasonal demand and inquiry sources, estimating tools with templates for new builds versus renovations, scheduling with task dependencies for multi-phase builds, job costing that tracks estimated versus actual costs on each phase, permit and inspection tracking, a customer portal for homeowner updates, time tracking with GPS verification, invoicing with progress billing for long projects, and QuickBooks integration. Projul includes all of these and is rated 4.9/5 on G2 for ease of use.
What makes Projul special?
Projul was built by a contractor who understood that construction software should match how contractors actually work. For pool contractors, that means a platform designed for long project timelines, multi-phase scheduling, and the kind of client communication that keeps homeowners calm during a 12-week build. Projul's Core plan is a flat $4,788 per year for up to 10 users, so your entire team gets access without per-user fees. Over 5,000 contractors trust Projul, and G2 users rate it 4.9 out of 5 for ease of use.
How does pool contractor software handle weather delays?
Weather is the biggest variable in pool construction. You cannot excavate in saturated ground. You cannot pour gunite in a rainstorm. You cannot do plaster when temperatures drop below 50 degrees. Pool contractor software like Projul lets you shift affected phases on the schedule and immediately see how the delay impacts every downstream trade. Your tile crew, equipment installer, and plaster crew all get updated schedules on their phones without a round of phone calls.
Can Projul handle both new pool builds and renovation projects?
Yes. New pool builds and renovations follow different workflows, but both involve multi-phase scheduling, permit tracking, and trade coordination. Projul lets you create separate project templates for new builds and renovations so your estimating and task sequencing matches the scope. A replaster and retile project has a different checklist than a full new build with excavation, but both benefit from the same scheduling, job costing, and client communication tools.
How does Projul handle progress billing for pool projects?
Pool builds typically bill by milestone: deposit at signing, a draw after excavation, a draw after the shell, a draw after tile and coping, and final payment at startup. Projul lets you set up invoice milestones tied to project phases and send each invoice when the work is done. Homeowners pay online through the customer portal, which speeds up collections and keeps your cash flow healthy across multiple active builds.
Can my pool crew use Projul without being tech-savvy?
Yes. Projul is rated 4.9/5 on G2 for ease of use. The mobile app has big buttons and simple navigation that works in the sun on a dusty phone. Most crews are using it by lunchtime on day one. They check their schedule, clock in with GPS, take job site photos, and update task status without a training course.
Does Projul help manage subcontractors on pool builds?
Pool builds involve a lot of subs: excavation, plumbing, electrical, gunite, tile, decking, and equipment installers. Projul's flat-rate pricing lets you give every sub access to their schedule and project details without paying per-user fees. They see their assignments on the mobile app, mark tasks complete, and stay coordinated with your timeline so you are not making a round of phone calls every time a phase shifts.
No pushy sales reps Risk free No credit card needed