Select Page

Abutment

A supporting structure at the ends of bridges or arches that transfers loads from the superstructure to the foundation. Use Projul to have access to a live construction cost database.

Acoustical Tile

Tiles designed to absorb sound and reduce noise levels within a space. Commonly used in ceilings and walls, acoustical tiles improve the acoustic comfort of offices, auditoriums, and other buildings. Use Projul to have access to a live construction cost...

Actuator

A mechanical device used in construction systems to control movement or operate valves and dampers. Use Projul to have access to a live construction cost database

Addendum

A formal document issued to modify or clarify the original construction contract, plans, or specifications, typically used to address changes before the contract is finalized. Use Projul to organize contracts and change orders

Adhesive

A substance used for bonding materials together, such as glues, cements, or pastes. Adhesives are essential in construction for securing flooring, tiles, insulation, and other building materials. Use Projul to have access to a live construction cost...