Skip to main content

JobNimbus Pricing 2026: How Much It Really Costs

Analysis of JobNimbus pricing plans for contractors

JobNimbus doesn’t publish its prices, and the number you’ll hear first isn’t your real bill. That’s because JobNimbus uses a three-layer pricing model: an account-based CRM fee, per-user charges for every person on your team, and separate add-on costs for features like texting. Third-party figures (ITQlick, June 2026) put the first two layers at $225 or $550 a month plus $20 to $75 per user. For a team of five, that’s $325 to $925 per month. For a team of ten, it’s $425 to $1,300.

We researched the current plans, pulled real pricing data from third-party sources, and read through reviews from contractors on G2, Capterra, Reddit, and industry forums. If you’re evaluating JobNimbus for your business, here’s what you need to know before you talk to their sales team.

How JobNimbus Pricing Actually Works

Unlike most construction software that gives you a single monthly price, JobNimbus stacks three separate costs on top of each other. This makes it hard to know your real monthly bill until you do the math yourself.

Layer 1: The Base CRM Plan

In 2026 JobNimbus renamed its plans. There are four, and every one is marked “request pricing”:

  • Essentials: up to 3 users
  • Pro: up to 10 users
  • Premium: up to 19 users
  • Enterprise: 20+ users

Each plan is an account-based CRM price plus per-user fees. JobNimbus doesn’t publish the numbers, so you’ll get them on a sales call. The most recent third-party figures (ITQlick, June 2026) still use JobNimbus’s older plan names: Growing at $225/month and Established at $550/month, before any user fees.

That $325/month gap between the older plans was steep. And the older entry plan (Growing) capped automations and integrations and had no API access, limits tight enough that most active businesses bumped into them within a few months. Ask which limits apply to the 2026 plan you’re quoted.

Layer 2: Per-User Fees

Here’s where JobNimbus gets expensive. Every single person who needs to log in pays a separate monthly fee, and the fee depends on their role. ITQlick puts it at $20 to $75 per user per month.

These fees are on top of your base plan. If you’re a one-person shop, you’re already at $245 to $300/month on the $225 entry plan before you’ve added a single feature. Add three more people, and your base + user cost on that plan reaches $305 to $525/month.

Layer 3: Texting Add-On (Engage)

Want to text customers through JobNimbus? That’s a separate add-on subscription called Engage, billed on top of your plan and user fees. JobNimbus doesn’t publish its price, so ask for it with your quote.

Texting isn’t a nice-to-have in 2026. Homeowners expect it. But JobNimbus treats it as a premium add-on instead of a built-in feature.

Real-World Cost Scenarios

The three-layer pricing makes it tough to figure out what you’ll actually pay. So let’s run the third-party numbers ($225 or $550 a month plus $20 to $75 per user) for common team sizes. None of these include texting.

Solo Operator

  • Entry plan: $225
  • 1 user: $20 to $75
  • Monthly Total: $245 to $300
  • Annual Cost: $2,940 to $3,600

That’s up to $300/month for one person running a roofing business. You get CRM and basic workflows. No estimating. No job costing. No scheduling beyond a basic calendar.

Team of 5

  • Base plan: $225 or $550
  • 5 users: $100 to $375
  • Monthly Total: $325 to $925
  • Annual Cost: $3,900 to $11,100

Five users also puts you past Essentials (up to 3 users) and into JobNimbus’s Pro tier. And if your plan caps integrations the way the older entry plan did, QuickBooks, CompanyCam, EagleView, a proposal tool, and Zapier could use them all up right there.

Team of 10

  • Base plan: $225 or $550
  • 10 users: $200 to $750
  • Monthly Total: $425 to $1,300
  • Annual Cost: $5,100 to $15,600

Up to $15,600 per year. And that still doesn’t include texting, measurement tools, photo documentation add-ons, or the time your team spends learning the system.

The Hidden Costs Nobody Talks About

The subscription and per-user fees are just the beginning. Here are the costs that won’t show up until you’re already committed.

Measurement Tools Cost Extra

JobNimbus doesn’t include property measurement. If you’re a roofer (which is their primary market), you’ll need EagleView or HOVER:

  • EagleView: per-report or subscription pricing
  • HOVER: Similar per-report or subscription pricing

If your plan caps integrations, each of these also uses one of your slots. So you’re paying more AND burning through your integration cap.

Photo Documentation Is Separate

Need CompanyCam for before/after photos? That’s another subscription on top of everything else.

The Integration Cap Trap

JobNimbus advertises 30+ integrations. But its older entry plan (Growing) let you connect only 5 of them, so ask whether the plan you’re quoted has a cap. Five is a problem because most roofing companies need at least these:

  1. QuickBooks (accounting)
  2. EagleView or HOVER (measurements)
  3. CompanyCam (photos)
  4. A proposal tool like SumoQuote
  5. Zapier (for everything else)

That’s your entire allotment. Need one more? On the older plans, that meant upgrading to Established ($550/month in third-party figures).

Marketing Services, Not Software Features

JobNimbus lists “SEO,” “Paid Ads,” and “Website Services” on their site. These aren’t software features. They’re paid agency services through Roofer Marketers, a company JobNimbus acquired. You’ll pay additional monthly retainers on top of your CRM subscription for any of that.

What Real Contractors Are Saying

We went beyond the marketing materials to find what people actually think about JobNimbus.

On Reddit (r/JobNimbusIssues):

One contractor posted in mid-2024: “We’ve encountered constant issues with glitches, system slowdowns, and difficulty loading in the field.” For software your field crew relies on every day, that’s a dealbreaker.

On Reddit (r/Roofing):

A user in a thread about CRM frustrations pointed out that “things like JobNimbus are typically designed for the largest total addressable market because that’s what makes venture capital happy.” In other words, the product is built to serve the most people possible, not to serve any one type of contractor really well.

On Capterra:

A VP of Operations at a construction company with 11-50 employees noted: “The mobile app wasn’t our favorite and it could not do what we needed it to do in terms of reporting.” For a tool that’s supposed to help your field crew, a weak mobile app is a serious problem.

On Software Advice:

A reviewer mentioned wanting “the scheduling features to be updated” and better project management for non-customer work. Scheduling is a basic need, and JobNimbus’s approach is minimal compared to dedicated construction management tools.

JobNimbus Is Built for Roofing. That’s It.

This is the biggest thing to understand about JobNimbus before you buy it. The company’s own website says it plainly: “Plans Built For Roofing Contractors.”

If you’re a roofer or exterior contractor running a CRM-heavy sales operation, JobNimbus does some things well. Board-style workflows for tracking leads through your pipeline. Payment collection. Financing options for homeowners. These are built with roofers in mind.

But if you’re a general contractor, remodeler, plumber, electrician, or any other trade, you’ll run into walls fast. Here’s what JobNimbus doesn’t do well (or at all):

  • Detailed estimating and takeoffs. You’ll need a separate tool.
  • Job costing and budget tracking. No built-in cost-to-actual comparison.
  • Gantt chart scheduling. The calendar is basic. No resource allocation, no crew scheduling, no dependency tracking.
  • Change order management. Not built into the system.
  • Subcontractor management beyond basic contact info.
  • Daily logs with weather and photo documentation. Not native.
  • Time tracking with GPS and geofencing. Manual time logging only, and contractors have complained about the lack of mobile clock-in/clock-out.

If your business needs any of those features, you’re either bolting on third-party tools (more cost, more complexity) or you’re using the wrong software entirely.

Cost Comparison: JobNimbus vs. Projul

Let’s put the numbers side by side. Projul’s prices are published (as of October 2026) and have no per-user fees, so the math is straightforward. JobNimbus figures below are the ITQlick third-party range ($225 or $550 a month plus $20 to $75 per user), before texting.

Team of 10

JobNimbus (third-party estimate)Projul (Core)
Base plan$225 or $550/month$399/month (billed annually)
User fees (10 users)$200 to $750/month$0 (up to 10 users)
TextingAdd-onNot included
EstimatingNot includedIncluded
Job costingNot includedCore+ and Pro
Scheduling (Gantt)Not includedCore+ and Pro
Time tracking (mobile)LimitedIncluded
QuickBooks integrationIncludedCore+ and Pro
Monthly total$425 to $1,300$399 (billed annually)
Annual total$5,100 to $15,600$4,788

Annual savings with Projul: $312 to $10,812

Projul Core comes in below even the low end of the JobNimbus range. And with Projul, you’re getting estimating and mobile time tracking that JobNimbus doesn’t offer natively, plus job costing and Gantt scheduling on Core+.

Team of 20

JobNimbus (third-party estimate)Projul (Core+)
Base plan$225 or $550/month$599/month (billed annually)
User fees (20 users)$400 to $1,500/month$0 (up to 20 users)
TextingAdd-onNot included
EstimatingNot includedIncluded
Job costingNot includedIncluded
Scheduling (Gantt)Not includedIncluded
Monthly total$625 to $2,050$599
Annual total$7,500 to $24,600$7,188

Annual savings with Projul: $312 to $17,412

At the high end, that’s over $17,000 back in your pocket every year. And you’re getting a platform that was built for construction, not just roofing sales.

Beyond 20 Users

With JobNimbus, every new hire adds $20 to $75/month to your bill (third-party figures), and 20+ users puts you on its Enterprise tier. Projul has no per-user fees, and its Pro plan at $14,388/year gives you unlimited users and every feature in the platform, so your cost stays flat no matter how many people you add.

Why Contractors Switch from JobNimbus to Projul

The pattern we see from contractors making the switch usually comes down to three things:

1. They outgrew a roofing-only tool. Many contractors start in one trade and expand. A roofer who starts doing siding, gutters, and eventually full exterior remodels needs more than a CRM. They need estimating, scheduling, job costing, and subcontractor management. JobNimbus doesn’t offer those.

2. Per-user fees got out of control. When you’re a three-person shop, per-user pricing seems fine. But when you grow to 10, 15, or 20 people, those $20 to $75 seat charges (third-party figures) eat into your margins. Projul’s flat rate means growth doesn’t come with per-seat charges.

3. Their crew couldn’t use it in the field. Multiple reviewers have called out JobNimbus’s mobile app as a weak point. Glitches, slowdowns, and limited functionality make it frustrating for field workers. Projul’s mobile app was designed for people on jobsites, not sitting at desks. Your crew can be up and running by lunch on day one.

Is JobNimbus Worth It? Our Honest Take

Let’s break it down by who you are.

JobNimbus might work for you if:

  • You run a pure roofing sales operation focused on lead tracking and closing deals
  • Your team is small (under 5 people) and per-user costs are manageable
  • You don’t need estimating, job costing, or detailed scheduling
  • You’re okay paying extra for texting, measurements, and photo tools
  • Most of your workflow is CRM-based (leads, contacts, follow-ups, proposals)

JobNimbus probably isn’t worth it if:

  • You’re a general contractor, remodeler, or multi-trade company
  • Your team is growing and per-user fees will scale up fast
  • You need real project management tools like Gantt scheduling, job costing, and change orders
  • Your field crew needs a reliable mobile app that works on the jobsite
  • You’re paying for a CRM when what you really need is construction management software
  • You want one flat price without surprises as you add people

The bottom line: JobNimbus is a CRM that does roofing sales well. But it’s not construction management software. If you need to manage actual construction projects, from estimate through completion, you need a tool built for that.

Alternatives to JobNimbus

Projul (Best for Contractors Who Need More Than a CRM)

Projul was built by a contractor for contractors. It covers the full project lifecycle: CRM, estimating, scheduling, time tracking, job costing, invoicing, and QuickBooks integration. Flat-rate pricing starts at $2,388/year. No per-user fees.

Your field crew can start using it their first day. The mobile app works for people wearing gloves in the sun. And because it was designed by someone who actually ran a construction company, the workflows match how contractors think.

See Projul pricing | Watch a demo

AccuLynx

Another roofing-focused CRM, similar to JobNimbus but with stronger production management features. If you’re committed to a roofing-only tool and want more depth, AccuLynx is worth comparing. Pricing is also per-user and quote-based.

JobTread

Solid option for contractors who want strong financial tracking. Better project management than JobNimbus, with real job costing and estimating built in. Worth a look if you’re outgrowing a CRM-only tool but aren’t ready for a full platform.

Contractor Foreman

Covers basics for very small operations. Lacks the depth of Projul or JobNimbus for growing companies.

Want to see how Projul stacks up for your specific situation? Get a live demo and bring your questions. We’ll give you straight answers.

📚 Related: See our best JobNimbus alternatives and JobNimbus vs Projul comparison. Compare with Projul’s transparent pricing.

The Per-User Pricing Trap: How Costs Compound as You Grow

Per-user pricing sounds reasonable when you’re small. You have three people, you pay for three seats. Simple. But here’s the thing contractors miss: your software cost scales linearly while your revenue doesn’t.

When you go from 5 employees to 15, you don’t triple your revenue. You might go up 60 or 70 percent if things are going well. But your JobNimbus bill climbs with every hire, because each one comes with a $20 to $75 monthly surcharge (third-party figures).

Let’s look at how this plays out with real numbers, at each Projul plan’s user limit.

Annual Software Cost by Team Size

Team sizeJobNimbus (third-party estimate)Projul
3 users$3,420 to $9,300$2,388 (Starter)
10 users$5,100 to $15,600$4,788 (Core)
20 users$7,500 to $24,600$7,188 (Core+)

JobNimbus figures use ITQlick’s June 2026 range ($225 or $550 a month plus $20 to $75 per user per month), before texting or other add-ons.

At each of these team sizes, Projul costs less than even the low end of the JobNimbus range. And remember, Projul includes estimating and scheduling on every plan, plus job costing on Core+ and Pro, which JobNimbus charges extra for or doesn’t offer at all.

The pattern is clear. Within a Projul plan’s user limit, every person you hire makes the gap wider. Per-user pricing punishes growth. Flat-rate pricing rewards it.

Hidden Costs and Add-On Pricing Most Contractors Miss

We covered the big three layers above (base plan, per-user fees, texting). But there are more costs hiding in the fine print that catch contractors off guard after they’ve already signed up.

API Access May Require a Higher Plan

If you want to connect JobNimbus to any custom tool, your own website forms, a custom reporting dashboard, or anything not on their approved integrations list, you need API access. Under JobNimbus’s older plans, that was only available on Established ($550/month in third-party figures). On the entry Growing plan, you were locked out entirely. Ask whether the 2026 plan you’re quoted includes it.

This matters because a lot of contractors use Zapier or Make to connect their tools. On a plan with an integration cap, those eat up slots. And if Zapier can’t do what you need, you’re stuck unless you upgrade.

Integration Slot Limits Are a Real Problem

The older entry plan came with 5 integration slots. That sounds like enough until you start listing what you actually need:

  1. QuickBooks or Xero (accounting)
  2. EagleView or HOVER (measurements)
  3. CompanyCam (photos)
  4. Google Calendar or Outlook (scheduling)
  5. Zapier (to connect everything else)

That’s five. Done. Want to add your CRM to your email marketing tool? Want to connect a proposal platform? Want GPS tracking for your fleet? You’re out of slots. On the older plans, the only fix was upgrading to Established, a $325/month jump in third-party figures just to connect one more tool.

Premium Support and Training

JobNimbus offers basic support with every plan, but if you want dedicated onboarding, priority support, or customized training for your team, expect to pay extra. Some contractors have reported that getting help with complex setup questions requires escalation that takes days.

Data Migration Costs

Moving your existing data into JobNimbus (contacts, job history, photos, documents) isn’t always straightforward. While JobNimbus does offer import tools, contractors with large databases or complex project histories sometimes need paid migration assistance or consultant help to get everything set up correctly.

The Real Cost of Workarounds

When your platform doesn’t include job costing or detailed estimating, you end up building workarounds. Spreadsheets for budgets. Separate apps for scheduling. Manual data entry to keep everything synced. That’s not a line item on your invoice, but it costs you in labor hours every single week. A project manager spending 5 hours a week on manual workarounds at $35/hour costs you $9,100 per year in lost productivity.

What Happens When You Outgrow JobNimbus

JobNimbus works for a certain type of contractor at a certain stage of growth. The problem is what happens when you move past that stage.

The Roofing Ceiling

JobNimbus was designed for roofing sales teams. The board-style workflow, the payment collection, the financing tools. All of that works great when your business is knocking doors, writing proposals, and closing roofing jobs. But contractors grow. A roofing company that adds siding, gutters, windows, and eventually full exterior remodels needs tools that handle multiple trade types, complex scheduling across crews, and detailed cost tracking per project phase.

JobNimbus doesn’t scale into that. There’s no way to set up a Gantt chart for a three-week siding project with crew dependencies. There’s no built-in job costing to compare your estimated materials and labor against what you actually spent. There’s no change order workflow to handle scope changes mid-project.

Automation Limits Hit Fast

JobNimbus’s older entry plan (Growing) capped you at 10 automations. That sounds like plenty until you start building them out. A typical roofing company might automate:

  1. New lead notification to sales rep
  2. Follow-up reminder after 48 hours
  3. Status change when proposal is sent
  4. Payment reminder before due date
  5. Review request after job completion
  6. Subcontractor notification for scheduled work
  7. Office alert when job is marked complete
  8. Customer thank-you email after payment
  9. Weekly pipeline summary to owner
  10. Material order trigger on job approval

That’s 10. On that plan, you’re at the cap. Want to add an automation for warranty follow-ups? Upgrade to Established. Want seasonal campaign triggers? Upgrade. An automation limit like that is a growth ceiling built right into the pricing, so ask what the cap is on the 2026 plan you’re quoted.

Reporting Gets Thin

As your operation scales, you need deeper reporting. Which crews are most profitable? What’s your close rate by lead source? How do your actual costs compare to estimates across job types? JobNimbus gives you custom reports, but contractors consistently report that the reporting depth doesn’t match what larger operations need. When you’re running 50+ jobs at a time with 20 people in the field, you need a construction CRM that gives you real-time visibility, not just board views.

JobNimbus vs. Competitors: Side-by-Side

Let’s put JobNimbus next to the alternatives so you can compare apples to apples. We’re using a 10-person team as the benchmark.

10-User Team Comparison

FeatureJobNimbusBuildertrendJobTreadProjul (Core+)
TextingAdd-onIncludedNot includedNot included
EstimatingNot includedIncludedIncludedIncluded
Job costingNot includedIncludedIncludedIncluded
Gantt schedulingNot includedIncludedLimitedIncluded
Mobile app qualityMixed reviewsGoodGoodPurpose-built for field
Primary marketRoofingResidential buildersGCs/specialtyAll construction trades

A few things jump out from this comparison.

Buildertrend includes more built-in construction features than JobNimbus, but it’s aimed at residential home builders and remodelers. Buildertrend no longer publishes prices. Its last published plans (late 2024) started at $449 a month billed annually, and third-party estimates (Connecteam, September 2026) put a 20-person builder at $9,000 to $14,000 a year. If that’s your world, it’s worth a look. But it comes with a steep learning curve and complexity that smaller operations don’t need.

JobTread has strong financial tracking and is gaining traction with GCs who want tight budget control. The platform is solid but newer, with a smaller user community.

Projul hits the sweet spot for contractors who need real project management (not just a CRM) without the complexity of enterprise tools. Flat-rate pricing with no per-user fees means you’re not penalized for growing your team: a 10-person team pays $4,788 a year on Core, or $7,188 on Core+ with room for 20 users. And it includes estimating, scheduling, and time tracking out of the box, with job costing on Core+ and Pro. On Pro, Projul AI Connect adds a connection for the AI assistant you already use (like ChatGPT or Claude) to add leads, move them through your pipeline, and draft estimates, and the same key works with Zapier, Make, and n8n.

The key takeaway: once per-user fees are added, JobNimbus costs more than Projul at the team sizes above, and it offers the fewest built-in construction management features on this list. You’re paying for a CRM that needs a bunch of add-ons to function like a complete platform.

Migration Considerations: Switching Away from JobNimbus

If you’re already on JobNimbus and thinking about switching, here’s what you need to plan for.

What You Can Export

JobNimbus lets you export contacts, job records, and some financial data. You can pull CSV files of your contact database and basic job information. However, the depth of what comes out varies. Attached photos, documents, communication history, and workflow configurations typically don’t export cleanly.

What Gets Left Behind

The hardest things to migrate from any platform, including JobNimbus, are:

  • Communication history. Emails, texts, and notes tied to specific jobs often don’t transfer.
  • File attachments. Photos and documents attached to jobs may need to be downloaded and re-uploaded manually.
  • Workflow configurations. Your board layouts, automation rules, and custom fields don’t carry over. You’ll rebuild these in your new system.
  • Integration setups. Every tool you’ve connected to JobNimbus will need to be reconnected to your new platform.

Planning Your Switch

A clean migration typically takes 2 to 4 weeks for a team of 10 or fewer. Here’s a practical timeline:

Week 1: Export all contact and job data from JobNimbus. Download attached files. Set up your new platform with your team structure and permissions.

Week 2: Import contacts and job data into the new system. Rebuild your workflow stages and automations. Connect your integrations (QuickBooks, measurement tools, etc.).

Week 3: Run both systems in parallel. Enter new jobs in the new platform while referencing historical data in JobNimbus. Train your team on the new workflows.

Week 4: Cut over completely. Cancel your JobNimbus subscription. Make sure everyone knows where to find what they need.

Reducing the Pain of Switching

The best way to make migration easier is to pick a platform that handles it for you. Projul offers onboarding support with annual Core, Core+ and Pro plans that includes help importing your data and setting up your workflows. You don’t have to figure it all out yourself. Schedule a demo and ask about migration support. The team will walk you through exactly what the switch looks like for your situation.

One more thing to think about: the longer you wait, the more data you accumulate in a system you’ll eventually leave. If JobNimbus isn’t the right long-term fit, switching now saves you from a bigger migration headache later.

If you want a detailed comparison of JobNimbus and Projul, check out our full head-to-head breakdown. And for a look at what Projul includes at every price point, visit our pricing page.

Frequently Asked Questions

How much does JobNimbus cost per month?

JobNimbus doesn’t publish prices, and its 2026 plans (Essentials, Pro, Premium and Enterprise) are all request pricing. Third-party figures from ITQlick (June 2026, using the older Growing and Established plan names) put the base plan at $225 or $550/month, with every user adding $20 to $75/month depending on their role. Texting is a separate add-on. On those figures, a team of 5 pays $325 to $925 a month. For a team of 10, expect $425 to $1,300.

Does JobNimbus charge per user?

Yes. Every user pays a monthly fee that depends on their role, in addition to the base plan cost. Third-party figures (ITQlick, June 2026) put it at $20 to $75 per user per month. This is one of the biggest differences between JobNimbus and flat-rate platforms like Projul.

Is JobNimbus good for general contractors?

Not really. JobNimbus is built for roofing and exterior contractors. It lacks key features that GCs need: detailed estimating, Gantt scheduling, job costing, change order tracking, daily logs, and subcontractor management. If you’re a GC, look at tools designed for general construction like Projul.

What features does JobNimbus not include?

JobNimbus doesn’t natively include estimating or takeoffs, job costing, Gantt chart scheduling, change order management, mobile time clock, or daily logs. It also charges separately for texting and doesn’t include measurement tools like EagleView. These must be added as paid integrations or third-party subscriptions.

How does JobNimbus compare to Projul?

Projul starts at $2,388/year, and the Core plan is $4,788/year for up to 10 users. JobNimbus doesn’t publish prices, but third-party figures put a 10-person team at $5,100 to $15,600 a year once per-user fees are added, so Projul Core costs less than even the low end. Projul also includes estimating, scheduling, and time tracking on every plan, and job costing on Core+ and Pro, which JobNimbus doesn’t have natively.

Can I try JobNimbus before buying?

Yes. JobNimbus offers a 14-day free trial. This gives you time to test the CRM features and see if the workflow fits your business before committing to a paid plan.


Ready to move off JobNimbus? See our complete guide to switching from JobNimbus to Projul for a step-by-step migration plan.

Pricing information checked October 2026. JobNimbus doesn’t publish prices: its plan names come from JobNimbus’s website, and its price figures are third-party estimates from ITQlick (June 2026). Buildertrend figures come from its last published pricing (December 2024) and Connecteam (September 2026). Prices may vary based on promotions, contract terms, and negotiations. Contact Projul for current pricing.

Want more construction business tips from Projul in your Google results?

Frequently Asked Questions

How much does JobNimbus cost per month?
JobNimbus doesn't publish prices. Its 2026 plans (Essentials, Pro, Premium and Enterprise) are all request pricing: an account-based CRM price plus per-user fees by role. Third-party figures from ITQlick (June 2026, using JobNimbus's older Growing and Established plan names) put it at $225 or $550 a month plus $20 to $75 per user per month. On those figures, a solo operator on the entry plan pays $245 to $300 a month and a team of 10 pays $425 to $1,300, before add-ons like texting.
Does JobNimbus charge per user?
Yes. On top of the account-based CRM price, JobNimbus charges a monthly fee for every user, and the fee depends on the user's role. Third-party figures (ITQlick, June 2026) put it at $20 to $75 per user per month. These fees add up fast as your team grows.
Is there a free version of JobNimbus?
No. JobNimbus does not offer a free plan. They do offer a 14-day free trial so you can test it before committing. After the trial, you'll need a quote for one of its plans (Essentials, Pro, Premium or Enterprise), which combine a CRM price with per-user fees.
What plans does JobNimbus offer in 2026?
In 2026 JobNimbus renamed its plans Essentials (up to 3 users), Pro (up to 10), Premium (up to 19) and Enterprise (20+), all request pricing. Third-party price figures still use the older names: Growing at $225 a month and Established at $550 a month, before per-user fees. Under those older plans, the entry tier capped automations and integrations and had no API access, so ask which limits apply to the plan you're quoted.
Does JobNimbus include texting?
No. Texting is a separate add-on called Engage, priced on top of your plan and per-user fees. JobNimbus doesn't publish those prices, so ask for them with your quote.
Is JobNimbus good for general contractors?
JobNimbus was built specifically for roofing and exterior contractors. If you're a general contractor, remodeler, or custom home builder, you'll likely find it missing key features like detailed estimating, job costing, and scheduling tools that GCs depend on. Alternatives like Projul are built for the full range of construction trades.
How does JobNimbus compare to Projul on price?
Third-party figures put a 10-person JobNimbus team at $425 to $1,300 a month ($5,100 to $15,600 a year), depending on the plan and user mix. Projul's Core plan is $4,788 a year for up to 10 users with no per-user fees, below even the low end of that range. Projul also includes estimating and scheduling on every plan, and job costing on Core+ and Pro, which JobNimbus doesn't offer natively.
Can I export my data from JobNimbus?
JobNimbus allows some data export, but contractors have reported that migrating away can be difficult, especially for project histories and attached documents. Always ask about data portability before committing to any platform.
No pushy sales reps Risk free No credit card needed