Skip to main content

Free Exterior Remodel Estimate Templates (2026)

Free Exterior Remodel Estimate Templates (2026)

Quick answer: Siding and trim replacement costs about $20 per square foot of wall in 2026, so 1,600 sq ft of wall runs roughly $32,000. A full exterior remodel with siding, windows, a new entry door, and paint is about $29 per square foot, or $63,000 for 2,200 sq ft of wall.

Exterior remodels are some of the highest-value jobs a residential contractor sells, and some of the easiest to underprice. The scope looks simple from the curb, but it hides a lot of variables: rotted sheathing behind the old siding, windows that are out of square, flashing details nobody drew, scaffolding for a second story, and weather that stops the job for a week. A price that ignores any of those turns into your problem.

Material and labor costs have also shifted. Fiber cement, trim boards, replacement windows, and fiberglass doors all cost more than they did a few years ago, and skilled installers are not getting cheaper. If your estimate template still carries older unit costs, every bid you send is quietly eating into your margin.

These three templates cover the jobs exterior contractors price most often: a full exterior refresh, a siding and trim replacement, and a front porch and entry remodel. Each one breaks the job into demolition, materials, labor, subcontractors, and other costs, so you can see exactly where the money goes and adjust one line without redoing the whole estimate.



How to Use These Templates

Each template is organized into demolition and prep, materials, labor, subcontractors, and other costs. Here is how to make them work for you:

  1. Walk the house and measure every wall, then subtract the openings. Photograph problem areas like soft trim, failing flashing, and rotted sill plates.
  2. Confirm the scope with the homeowner: siding profile, trim style, window count and type, door, and paint colors.
  3. Get current pricing from your supplier for siding, trim, windows, and doors, including lead times.
  4. Estimate labor by task, since siding, trim, windows, doors, and paint each move at a different pace.
  5. Add access, disposal, and permits, including scaffolding, dumpsters, and fees.
  6. Set a contingency for hidden damage, then apply your overhead and profit.

The costs shown are mid-range U.S. estimates for 2026. Material prices, labor rates, and permit fees vary by region, so always verify pricing before sending a live estimate.


Template 1: Full Exterior Remodel

This exterior remodel template covers a full refresh of a two-story home with about 2,200 sq ft of wall area: fiber cement siding, new trim, ten replacement windows, a new entry door, and exterior paint. Adjust for your home and finish level.

Demolition and Prep

Line ItemQtyUnitUnit CostTotal
Remove existing siding and trim (labor)2,200sq ft$0.90$1,980.00
Remove and dispose of windows10each$50.00$500.00
Remove and dispose of front door1each$110.00$110.00
Scaffolding rental with delivery and pickup1lot$1,400.00$1,400.00
Dumpster rental (20-yard), two pulls2each$650.00$1,300.00
Demolition and Prep Subtotal$5,290.00

Materials

Line ItemQtyUnitUnit CostTotal
7/16 in OSB sheathing repair allowance20sheets$32.00$640.00
Housewrap and seam tape2,200sq ft$0.40$880.00
Window and door flashing tape6rolls$38.00$228.00
Fiber cement lap siding, primed, 8.25 in2,200sq ft$3.10$6,820.00
Fiber cement corner and window trim boards900lin ft$3.20$2,880.00
Fascia and soffit repair (PVC trim)160lin ft$5.50$880.00
Vinyl or fiber-composite replacement windows (double hung)8each$620.00$4,960.00
Large picture or slider window2each$950.00$1,900.00
Fiberglass entry door, prehung with sidelites1each$2,200.00$2,200.00
Door hardware and deadbolt1set$240.00$240.00
Stainless siding nails and fasteners1lot$220.00$220.00
Exterior caulk and sealant24tubes$9.00$216.00
Exterior primer8gallons$38.00$304.00
Exterior paint, acrylic (two coats)16gallons$55.00$880.00
Light fixtures, hose bib covers, and exterior accessories1lot$350.00$350.00
Materials Subtotal$23,598.00

Labor

Line ItemQtyUnitUnit CostTotal
Install sheathing repair and housewrap24hours$60.00$1,440.00
Install fiber cement siding2,200sq ft$3.20$7,040.00
Install trim and corner boards900lin ft$3.00$2,700.00
Install windows10each$150.00$1,500.00
Install entry door1each$450.00$450.00
Prime and paint siding and trim2,200sq ft$1.50$3,300.00
Cleanup and final detail12hours$45.00$540.00
Labor Subtotal$16,970.00

Subcontractors

Line ItemQtyUnitUnit CostTotal
Electrical (relocate light fixtures and outlets)1lot$600.00$600.00
Gutter and downspout reinstall1lot$450.00$450.00
Subcontractors Subtotal$1,050.00

Equipment and Other Costs

Line ItemQtyUnitUnit CostTotal
Permit fee1each$450.00$450.00
Material delivery fees1lot$250.00$250.00
Contingency allowance (hidden rot)1lot$1,500.00$1,500.00
Equipment and Other Costs Subtotal$2,200.00

Summary

Amount
Demolition and Prep$5,290.00
Materials$23,598.00
Labor$16,970.00
Subcontractors$1,050.00
Equipment and Other Costs$2,200.00
Direct Cost Subtotal$49,108.00
Overhead (15%)$7,366.20
Profit (12%)$6,776.90
Total Estimate$63,251.10

Tips for This Template

  • Price the contingency for hidden rot as its own line. Homeowners accept a clearly labeled allowance far more easily than a surprise change order after the walls are open. A formal change order process covers anything beyond it.
  • Read the siding manufacturer’s installation requirements before you finalize the housewrap, flashing, and fastener lines. Skipping required details can void the product warranty. Our siding installation guide and sheathing and weather barrier guide cover what to include.
  • Scaffolding and two dumpster pulls are real money on a two-story job. Do not bury them in overhead, because they vary a lot between a ranch and a tall colonial.
  • Windows and the entry door are special order items. Confirm lead times before you promise a start date, and get the homeowner’s final selections in writing.
  • Add the electrical and gutter work as subcontractor lines so you collect markup on them and keep the schedule coordinated.

Template 2: Siding and Trim Replacement

This siding replacement template covers about 1,600 sq ft of wall area on a single-story or small two-story home with new fiber cement siding, trim, and paint. Adjust quantities after measuring the wall area and subtracting openings.

Demolition and Prep

Line ItemQtyUnitUnit CostTotal
Remove existing siding and trim (labor)1,600sq ft$0.85$1,360.00
Dumpster rental (20-yard)1each$650.00$650.00
Scaffolding or ladder jack rental1lot$700.00$700.00
Protect landscaping and AC units1lot$150.00$150.00
Demolition and Prep Subtotal$2,860.00

Materials

Line ItemQtyUnitUnit CostTotal
Housewrap and seam tape1,600sq ft$0.40$640.00
Flashing tape at windows and doors4rolls$38.00$152.00
Sheathing repair allowance (OSB)10sheets$32.00$320.00
Fiber cement lap siding, primed1,600sq ft$3.10$4,960.00
Fiber cement trim boards (corners, windows, doors)650lin ft$3.20$2,080.00
Starter strip and Z-flashing160lin ft$2.40$384.00
Fascia and soffit repair (PVC)100lin ft$5.50$550.00
Stainless siding nails and fasteners1lot$160.00$160.00
Exterior caulk and sealant16tubes$9.00$144.00
Exterior primer5gallons$38.00$190.00
Exterior paint, acrylic10gallons$55.00$550.00
Materials Subtotal$10,130.00

Labor

Line ItemQtyUnitUnit CostTotal
Install sheathing repairs and housewrap14hours$60.00$840.00
Install fiber cement siding1,600sq ft$3.20$5,120.00
Install trim and corner boards650lin ft$3.00$1,950.00
Prime and paint siding and trim1,600sq ft$1.50$2,400.00
Cleanup and final detail8hours$45.00$360.00
Labor Subtotal$10,670.00

Equipment and Other Costs

Line ItemQtyUnitUnit CostTotal
Permit fee1each$300.00$300.00
Material delivery fee1each$175.00$175.00
Contingency allowance (hidden rot)1lot$1,000.00$1,000.00
Equipment and Other Costs Subtotal$1,475.00

Summary

Amount
Demolition and Prep$2,860.00
Materials$10,130.00
Labor$10,670.00
Equipment and Other Costs$1,475.00
Direct Cost Subtotal$25,135.00
Overhead (15%)$3,770.25
Profit (12%)$3,468.63
Total Estimate$32,373.88

Tips for This Template

  • Measure wall area carefully and subtract openings, but leave a waste factor in the siding and trim quantities. Fiber cement is cut a lot at windows, corners, and gables.
  • Housewrap, seam tape, and flashing tape are cheap compared to what a leak costs. Price them properly so you are not tempted to cut them under pressure.
  • Prime and paint labor is easy to underestimate. If the siding is delivered primed, you still need finish coats and caulk touch-ups, and weather can delay each coat.
  • Protect landscaping and AC units, and price it. A crushed shrub or a dented condenser costs more than the line item.
  • Offer a color or profile upgrade as an optional add-on. It gives the homeowner a choice without reworking the whole estimate.

Template 3: Front Porch and Entry Remodel

This front porch template covers a refresh of an 8x12 covered entry with composite decking, new columns and railing, ceiling finish, entry door, and lighting. Adjust for your porch size and footing needs.

Demolition and Prep

Line ItemQtyUnitUnit CostTotal
Demo existing porch decking, railing, and columns (labor)1lot$1,400.00$1,400.00
Dumpster rental (10-yard)1each$450.00$450.00
Temporary shoring of porch roof1lot$350.00$350.00
Demolition and Prep Subtotal$2,200.00

Materials

Line ItemQtyUnitUnit CostTotal
Concrete for footings (4 piers)1lot$420.00$420.00
Pressure-treated framing lumber (joists, beams, ledger)1lot$1,250.00$1,250.00
Joist hangers, post bases, and structural fasteners1lot$260.00$260.00
Composite decking boards100sq ft$7.50$750.00
Composite fascia and riser boards60lin ft$6.50$390.00
Pressure-treated posts, 6x6 (wrapped in PVC)4each$140.00$560.00
PVC column wraps and trim4each$210.00$840.00
Aluminum or composite railing22lin ft$55.00$1,210.00
Beadboard porch ceiling (PVC)96sq ft$4.20$403.20
Fiberglass entry door, prehung1each$1,800.00$1,800.00
Door hardware and deadbolt1set$220.00$220.00
Exterior lighting (2 sconces and ceiling light)1lot$380.00$380.00
Primer and exterior paint5gallons$50.00$250.00
Exterior caulk, fasteners, and flashing1lot$250.00$250.00
Materials Subtotal$8,983.20

Labor

Line ItemQtyUnitUnit CostTotal
Footings and framing28hours$65.00$1,820.00
Install decking, fascia, and risers100sq ft$6.00$600.00
Install columns and railing16hours$65.00$1,040.00
Install ceiling12hours$62.00$744.00
Install entry door1each$450.00$450.00
Painting14hours$55.00$770.00
Cleanup6hours$45.00$270.00
Labor Subtotal$5,694.00

Subcontractors

Line ItemQtyUnitUnit CostTotal
Electrical (fixtures and switch)1lot$550.00$550.00
Concrete step or landing (4x5 slab)1lot$1,250.00$1,250.00
Subcontractors Subtotal$1,800.00

Equipment and Other Costs

Line ItemQtyUnitUnit CostTotal
Permit fee1each$250.00$250.00
Material delivery fee1each$125.00$125.00
Contingency allowance1lot$600.00$600.00
Equipment and Other Costs Subtotal$975.00

Summary

Amount
Demolition and Prep$2,200.00
Materials$8,983.20
Labor$5,694.00
Subcontractors$1,800.00
Equipment and Other Costs$975.00
Direct Cost Subtotal$19,652.20
Overhead (15%)$2,947.83
Profit (12%)$2,712.00
Total Estimate$25,312.03

Tips for This Template

  • Porch framing and footings are where surprises hide. Check local code for frost depth, ledger attachment, and railing height before you price the structure.
  • Temporary shoring of the porch roof is easy to forget and critical for safety when columns come out. Keep it on the estimate.
  • Composite and PVC products cost more up front but cut painting and maintenance. Present both options when homeowners push on price.
  • The concrete step or landing is a good subcontractor line. Get a firm quote before you send the estimate.
  • Photograph the old porch before demolition. It protects you if anyone questions the condition of the existing structure.

Adjusting These Templates for Your Business

Know Your Material Costs

Siding, trim, windows, and doors make up the largest share of most exterior estimates. In our full remodel template, materials are close to half of the direct cost. Build relationships with two or three suppliers, compare pricing on every large order, and ask about contractor discounts and delivery fees. Even a few percent saved on materials goes straight to your bottom line.

Calculate Your True Labor Cost

Use job costing tools to track what labor really costs you. Hourly wages are only part of it. Add workers comp, insurance, payroll taxes, truck costs, and benefits, and the true cost per hour is much higher than the paycheck. Your billing rate needs to cover that cost plus overhead and profit. If you sub out installation by the square foot, make sure your rate still covers supervision and callbacks.

Offer Good-Better-Best Options

Exterior work is a natural fit for tiers. Show a basic vinyl or primed fiber cement option, a mid-range package, and a premium package with upgraded windows and a fiberglass door. Most homeowners choose the middle option, and some choose the top one. You never sell the premium package if you never present it.

Move to Digital Estimates

Homeowners usually collect two or three bids on exterior work, and the contractor who sends a clear, itemized estimate first often wins. Projul’s estimating tools let you build and send estimates from your truck right after the walk-through, with photos attached. No going back to the office. No delays. Schedule a demo to see how it works.


How to Estimate an Exterior Remodel Step by Step

Whether you are pricing a siding replacement or a full exterior refresh, follow this process to build accurate estimates every time.

Step 1: Complete the Site Visit

Walk every elevation. Note the existing siding type, age, and condition, check for soft spots under windows and at the base of walls, look at the roof overhangs and gutters, and see how scaffolding or lifts could be set up. Take photos of everything. A 45-minute walk-through saves hours of rework and protects you from missing a problem you will pay for later.

Step 2: Measure and Calculate Quantities

Measure wall area, trim linear footage, window and door counts, and fascia and soffit lengths. Subtract large openings. Add waste, typically around 10% for lap siding and more for complex rooflines. Record every number so the estimate can be updated if the homeowner changes the scope.

Step 3: Select Products and Get Pricing

Confirm the siding profile, trim boards, window series, door, and paint system. Call your supplier for current pricing and lead times. Special order windows and doors can take weeks, which affects scheduling and deposits.

Step 4: Estimate Labor by Task

Break labor into demolition, sheathing repair, housewrap, siding, trim, windows, door, paint, and cleanup. Assign hours or unit rates to each. Be honest about how fast your crew works, and account for weather days. Underestimating labor is the fastest way to lose money on exterior jobs.

Step 5: Add Access, Disposal, Permits, and Contingency

List scaffolding, dumpsters, permits, delivery fees, and the contingency allowance. Missing a few hundred dollars in fees on every job adds up quickly across a year.

Step 6: Apply Overhead and Profit

Add your overhead percentage to cover trucks, insurance, tools, software, and office staff. Then add profit. Our templates use 15% overhead and 12% profit on residential work. If your numbers look tight, review your labor rates and overhead allocation before cutting profit.

Step 7: Review, Send, and Follow Up

Double-check every quantity and unit cost before sending. Use estimating software to deliver a professional estimate right after the visit. Follow up within 48 hours if you have not heard back.


Common Mistakes That Cost Exterior Contractors Money

Skipping the contingency. Hidden rot is the norm on older homes, not the exception. If your estimate has no allowance and no change order language, you absorb the repair.

Using old material pricing. Siding, trim, windows, and doors move in price. If your template has last year’s numbers, every bid is wrong.

Forgetting access and disposal. Scaffolding, dumpsters, and delivery fees are easy to leave off and expensive to absorb.

Underpricing prep and paint. Priming, caulking, and finish coats take time, and weather stretches the schedule. Price the labor honestly.

Not accounting for lead times. A job that stalls for three weeks waiting on windows ties up your crew and your cash flow. Confirm lead times before you promise a start date.


Looking for templates for other trades? These free estimate templates follow the same format with realistic line items and pricing for 2026.

Need a template for a different trade? Check our full list of free estimate templates covering construction trades from roofing to flooring.


What Every Exterior Remodel Estimate Needs Beyond the Numbers

  • Product specifications. Siding brand, profile, and color, window series and size, door model, trim material, and paint system. Do not just write “new siding.”
  • Measurements. The wall area, trim footage, and opening counts you priced from, so scope changes are easy to adjust.
  • Scope of work. Write a clear scope of work. “Remove existing siding and trim. Repair sheathing as needed up to the allowance. Install housewrap, fiber cement siding, and trim. Install ten replacement windows and one entry door. Prime and paint.”
  • Timeline. “Estimated 15 working days from start, weather and inspections permitting.”
  • Warranty details. Your labor warranty and the manufacturer warranties for siding, windows, and doors, along with what voids them.
  • Payment terms. “50% deposit at scheduling, 50% due at completion.” Use invoicing software to collect payments faster.
  • Exclusions. “Does not include repairs to framing beyond the allowance, interior drywall repair, landscaping, or work by others.”
  • Change order language. Explain how hidden damage will be priced and approved.

Frequently Asked Questions

Check the FAQ section above for answers to common questions about exterior remodel costs, measuring wall area, hidden rot, permits, and estimate validity.


Start Sending Better Estimates Today

These templates give you a strong starting point for full exterior remodels, siding replacements, and porch and entry projects. Plug in your material pricing, adjust for your market, and start sending professional estimates that win more jobs.

If you want to stop losing bids to contractors who respond faster, Projul’s estimating features let you build and send exterior remodel estimates from your truck. Built for contractors. Schedule a live demo and see the difference.


DISCLAIMER: We make no warranty of accuracy, timeliness, and completeness of the information presented on this website. Posts are subject to change without notice and cannot be considered financial advice.

Want more construction business tips from Projul in your Google results?

Frequently Asked Questions

How much does an exterior remodel cost in 2026?
It depends on scope. In our 2026 templates, a siding and trim replacement on about 1,600 sq ft of wall comes to roughly $32,000, a front porch and entry remodel runs about $25,000, and a full exterior remodel with siding, ten windows, a new entry door, and paint lands around $63,000. Your numbers will move with local labor rates, material choices, and how much hidden rot you find once the old siding is off.
How do I measure wall area for a siding or exterior estimate?
Multiply the length of each wall by its height and add them up, including gable triangles (half of base times height). Then subtract large openings like garage doors and picture windows. Many contractors only subtract openings bigger than about 20 sq ft, since small windows and doors take extra cutting and trim time. Round up a little for waste, and write the final square footage on the estimate so the homeowner can see what you priced.
Should I include a contingency for hidden rot?
Yes. You cannot see sheathing or framing damage until the old siding and housewrap come off, especially around windows, decks, and roof lines. Our templates carry a contingency allowance line, and you can also price sheathing repair per sheet so there is a clear rate if more is needed. Spell out in the estimate how overages will be billed so there are no surprises for the homeowner.
What profit margin should exterior remodelers target?
Our templates use 15% overhead and 12% profit on top of direct cost, which is a common starting point for residential exterior work. Your overhead depends on your real costs for trucks, insurance, software, and office staff, so calculate it from your own books. Complex jobs with multiple trades, tight schedules, or higher risk usually justify a higher profit percentage.
Do exterior remodels need a permit?
Often yes. Replacing windows and doors, altering openings, building or rebuilding a porch, and sometimes re-siding all trigger permits in many jurisdictions. Fees and rules vary by city and county, so check locally. Put the permit fee on the estimate as its own line, and note who is responsible for pulling it.
What is the best time of year to schedule exterior work?
Spring through fall is easiest, since paint, caulk, and sealants need dry weather and moderate temperatures to cure properly. Many contractors fill their schedule early in the season, so quote realistic start dates and keep a weather buffer in the timeline. Winter work is possible in some climates but needs more planning around housewrap exposure and open wall cavities.
How long should an exterior remodel estimate be valid?
Most contractors keep estimates valid for 30 days. Siding, windows, doors, and lumber prices move, and special order items like windows can carry long lead times. State the expiration date on the estimate, and note that pricing may change if the customer waits for the contract to be signed.
Can I use these templates for siding only or for single-trade jobs?
Yes. The Siding and Trim Replacement template is built for that case, and every template is an editable workbook. Delete the sections you do not need, change quantities, and update unit costs for your market. The overhead and profit percentages recalculate automatically.
No pushy sales reps Risk free No credit card needed